For the best experience, visit this website on desktop.

0%

Powering AI. Restoring the Planet.

What we do

Carbon-negative AI infrastructure.
Grid-independent and engineered for AI at scale.

Hyfion develops and operates modular, grid-independent AI data centers that combine high-performance GPU computing, carbon-negative energy and secure European cloud infrastructure in one scalable platform. Designed to scale from 3.5 MW to more than 250 MW per site, our infrastructure makes every GPU hour CO₂-negative and delivers scalable computing power with measurable climate impact.

00Infrastructure, reimagined.

Built from
the ground up.

Powering Europe’s Sovereign AI Future.

SCROLL TO EXPLORE
01GRID-INDEPENDENT AI INFRASTRUCTURE

GRID-INDEPENDENT AI INFRASTRUCTURE

Built Beyond
the Grid.

Hyfion is built around a fully island-capable energy system, delivering firm on-site baseload power independently of the public grid, while retaining the flexibility to integrate additional grid capacity for further expansion.

02MODULAR, REPEATABLE & SCALABLE

MODULAR, REPEATABLE & SCALABLE

One Model.
Limitless Scale.

A standardized infrastructure model uniting energy generation, carbon removal and AI compute, designed to scale from 3.5 MW to 250+ MW campuses and be replicated across multiple sites.

03CARBON-NEGATIVE

CARBON-NEGATIVE

Compute More.
Remove More.

Every GPU hour is powered by infrastructure that removes and permanently binds more CO₂ than it emits. Carbon removal is integrated directly into the energy system, not added through conventional offsets.

04MEASURED CLIMATE IMPACT

MEASURED CLIMATE IMPACT

150,000 Tonnes
of CO₂ Removal

At a 50 MW IT site, Hyfion is designed to permanently remove up to 150,000 tonnes of CO₂ annually through its integrated energy and carbon-removal system.

≈ 3,000 t1CO₂ REMOVED ANNUALLY PER MW OF IT CAPACITY

Figure based on the planned 50 MW site configuration and internal modelling of the integrated energy and carbon-removal system. Actual removal volumes depend on final system design and operating conditions, and are subject to independent verification.

0596-HOUR SELF-SUFFICIENCY

96-HOUR SELF-SUFFICIENCY

Dual-Layer
Power Resilience

A separate backup power system takes over if primary on-site generation becomes unavailable, maintaining full autonomous site operation for up to 96 hours without grid support.

06EUROPEAN SOVEREIGN AI CLOUD

EUROPEAN SOVEREIGN AI CLOUD

European Data.
European Control.

A sovereign, end-to-end European cloud architecture keeps data, models, compute capacity and operational control within Europe, ensuring sensitive AI workloads remain protected and governed under European jurisdiction.

Grid-Independent AI Infrastructure

AI infrastructure designed for full island-mode operation. Hyfion generates its power on-site through an integrated energy system, supported by large-scale battery storage and up to 96 hours of operational autonomy.

Carbon-Negative

Every GPU hour is powered by infrastructure that removes more CO₂ than it emits, structurally, not through conventional offsets. Carbon removal is built directly into the energy system, making climate impact part of the core architecture.

Modular, Repeatable & Scalable from 3.5 MW to 250+ MW

One standardized infrastructure model combining firm on-site energy generation, carbon removal and AI compute. Following validation at our first site, the model is designed to be replicated across Europe and scaled from modular 3.5 MW deployments to multi-hundred-megawatt AI campuses, built on an island-capable energy base with the flexibility to integrate additional grid capacity where available.

Engineered for AI at scale.
Powered beyond the grid.

Next-generation GPU infrastructure for frontier AI. Engineered for scale, resilience and carbon-negative performance.

NVIDIA GB300 NVL72
GB300 NVL72Details
NVIDIA GB200 NVL72
GB200 NVL72Details
NVIDIA HGX B200
HGX B200Details
NVIDIA HGX B300
HGX B300Details

More GPUs, CPUs and storage available on request.

Contact us

From first site to European scale.

  1. 2026

    Funding & Project Development

    Securing financing, finalizing planning and bringing strategic partners on board.

  2. 2027

    Construction Start & Site Development

    Start of site development and construction of the energy and data center infrastructure.

  3. 2029

    Ramp-up Phase 1

    Commissioning of the first Hyfion site, initially with 3.5 MW IT capacity.

  4. From 2029

    Scaling Phase

    Expanding the first campus through an independently powered baseload core of 25 MW and additional regional energy capacity, scaling to more than 250 MW of IT load.

  5. Vision

    European Rollout & Gigawatt Scale

    Building a distributed network of sovereign, carbon-negative AI campuses across Europe and developing selected sites toward gigawatt-scale capacity.